Sunrise and sunset times in Raciążek
EditCheck out today's and tomorrow's sunrise and sunset times in Raciążek, as well as the whole calendar for November 2026.
Today
November 18, 2026. Current time: 3:24:30 pm
Night ends at 5:11 am5:11:01 am
Start of astronomical twilight: the Sun is 18° below the horizon and the sky begins to brighten, too faintly to notice in a city.·First light at 6:34 am6:34:10 am
Dawn, the start of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.
Sunrise time: 7:13:00 amWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley).
Sunset time: 3:46:11 pmWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley).
Dark at 4:25 pm4:25:00 pm
Dusk, the end of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.·Night at 5:48 pm5:48:04 pm
End of astronomical twilight: the Sun is 18° below the horizon and the sky is dark enough to see the faintest stars. In a city it looks dark sooner.
Sun position chart
Now · Sun altitude: 1.89° · Azimuth: 233.73° (SW)
Daylight Golden Hour Blue Hour Twilight Night
Day length: 8 hours, 33 minutes
21 minutes left for today's sunset in Raciążek
Tomorrow
November 19, 2026
Night ends at 5:12 am5:12:28 am
Start of astronomical twilight: the Sun is 18° below the horizon and the sky begins to brighten, too faintly to notice in a city.·First light at 6:36 am6:35:47 am
Dawn, the start of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.
Sunrise time: 7:14:45 amWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley).
Sunset time: 3:44:53 pmWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley).
Dark at 4:24 pm4:23:50 pm
Dusk, the end of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.·Night at 5:47 pm5:47:05 pm
End of astronomical twilight: the Sun is 18° below the horizon and the sky is dark enough to see the faintest stars. In a city it looks dark sooner.
Day length: 8 hours, 30 minutes
Tomorrow will be 3 minutes shorter than today in Raciążek
- Raciążek, Kujawsko-Pomorskie
- Latitude: 52.856499 (North)
- Longitude: 18.813339 (East)
- Time zone: Central European Standard Time (CET, UTC+1)
Shortest day in Raciążek, Kujawsko-Pomorskie
The shortest day of the year will be in 1 month and 3 days, during the winter solstice on December 21, 2026, with a daylight length of 7 hours, 35 minutes.Longest day in Raciążek, Kujawsko-Pomorskie
The longest day of the year was around 4 months ago, during the summer solstice on June 21, 2026, with a daylight length of 16 hours, 54 minutes.November 2026 - Raciążek, Kujawsko-Pomorskie - Sunrise and sunset calendar
Sunrise and sunset times, civil twilight start and end times as well as solar noon, and day length for every day of November in Raciążek.
All times are in Raciążek's time: Central European Standard Time (CET, UTC+1).
The day length shortens by 1 hour, 32 minutes over the course of November 2026 in Raciążek, Kujawsko-Pomorskie - from 9 hours, 32 minutes on the first day to 8 hours on the last day.
| Day | First LightStart of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light. | SunriseWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley). | Sunrise Variation |
SunsetWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley). | Sunset Variation |
Last LightEnd of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors. | Day Length | Day Length Variation | Solar NoonTime of day when the sun reaches its highest point in the sky. | Max Sun Altitude | Nautical Twilight Start | Nautical Twilight End | Astronomical Twilight Start | Astronomical Twilight End | Night LengthCalculated from this day's sunset to the next day's sunrise. | Moon phase | Solar Midnight | Sun DeclinationThe latitude where the Sun is directly overhead at solar noon (the Sun's declination). It moves between the two tropics through the year. | Moonrise | Moonset |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sun, Nov 1 | Twilight startStart of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.6:05:20 am | 6:41:44 am | +1m 52s | 4:14:05 pm | -1m 55s | Twilight endEnd of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.4:50:27 pm | 9h 32m 21s | -3m 47s | Solar noonTime of day when the sun reaches its highest point in the sky.11:28:17 am | 22.64° | 5:24:36 am | 5:31:07 pm | 4:44:40 am | 6:10:58 pm | Night lengthCalculated from this day's sunset to the next day's sunrise.14h 29m 31s | 🌗 (49%) Last quarter at 9:28 pmLast quarter at 9:28 pm. At midnight, at the end of the day: 49% illuminated |
11:28:17 pm | 14.5° S | ||
| Mon, Nov 2 | 6:07:04 am | 6:43:36 am | +1m 52s | 4:12:11 pm | -1m 54s | 4:48:41 pm | 9h 28m 35s | -3m 45s | 11:28:16 am | 22.33° | 5:26:15 am | 5:29:26 pm | 4:46:18 am | 6:09:19 pm | 14h 33m 17s | 🌘 (38%)Waning Crescent: 38% illuminated at midnight, at the end of the day | 11:28:16 pm | 14.8° S | ||
| Tue, Nov 3 | 6:08:48 am | 6:45:28 am | +1m 52s | 4:10:19 pm | -1m 52s | 4:46:56 pm | 9h 24m 51s | -3m 44s | 11:28:15 am | 22.01° | 5:27:54 am | 5:27:47 pm | 4:47:55 am | 6:07:42 pm | 14h 37m 0s | 🌘 (28%)Waning Crescent: 28% illuminated at midnight, at the end of the day | 11:28:16 pm | 15.1° S | ||
| Wed, Nov 4 | 6:10:32 am | 6:47:19 am | +1m 51s | 4:08:29 pm | -1m 50s | 4:45:14 pm | 9h 21m 10s | -3m 42s | 11:28:16 am | 21.70° | 5:29:33 am | 5:26:10 pm | 4:49:32 am | 6:06:07 pm | 14h 40m 42s | 🌘 (19%)Waning Crescent: 19% illuminated at midnight, at the end of the day | 11:28:17 pm | 15.4° S | ||
| Thu, Nov 5 | 6:12:16 am | 6:49:11 am | +1m 52s | 4:06:40 pm | -1m 49s | 4:43:34 pm | 9h 17m 29s | -3m 40s | 11:28:17 am | 21.40° | 5:31:12 am | 5:24:35 pm | 4:51:08 am | 6:04:35 pm | 14h 44m 23s | 🌘 (11%)Waning Crescent: 11% illuminated at midnight, at the end of the day | 11:28:18 pm | 15.7° S | ||
| Fri, Nov 6 | 6:14:00 am | 6:51:03 am | +1m 52s | 4:04:54 pm | -1m 46s | 4:41:55 pm | 9h 13m 51s | -3m 39s | 11:28:19 am | 21.10° | 5:32:50 am | 5:23:02 pm | 4:52:43 am | 6:03:04 pm | 14h 48m 1s | 🌘 (6%)Waning Crescent: 6% illuminated at midnight, at the end of the day | 11:28:21 pm | 16.0° S | ||
| Sat, Nov 7 | 6:15:43 am | 6:52:55 am | +1m 52s | 4:03:09 pm | -1m 45s | 4:40:18 pm | 9h 10m 14s | -3m 37s | 11:28:22 am | 20.80° | 5:34:27 am | 5:21:31 pm | 4:54:19 am | 6:01:36 pm | 14h 51m 37s | 🌘 (2%)Waning Crescent: 2% illuminated at midnight, at the end of the day | 11:28:24 pm | 16.3° S | ||
| Sun, Nov 8 | 6:17:26 am | 6:54:46 am | +1m 51s | 4:01:26 pm | -1m 43s | 4:38:44 pm | 9h 6m 40s | -3m 35s | 11:28:26 am | 20.51° | 5:36:05 am | 5:20:03 pm | 4:55:53 am | 6:00:10 pm | 14h 55m 12s | 🌘 (0.3%)Waning Crescent: 0.3% illuminated at midnight, at the end of the day | 11:28:29 pm | 16.6° S | ||
| Mon, Nov 9 | 6:19:09 am | 6:56:38 am | +1m 52s | 3:59:44 pm | -1m 42s | 4:37:11 pm | 9h 3m 6s | -3m 32s | 11:28:31 am | 20.22° | 5:37:41 am | 5:18:36 pm | 4:57:27 am | 5:58:47 pm | 14h 58m 45s | 🌑 (1%) New moon at 8:02 amNew moon at 8:02 am. At midnight, at the end of the day: 1% illuminated |
11:28:34 pm | 16.9° S | ||
| Tue, Nov 10 | 6:20:51 am | 6:58:29 am | +1m 51s | 3:58:05 pm | -1m 39s | 4:35:41 pm | 8h 59m 36s | -3m 30s | 11:28:36 am | 19.94° | 5:39:18 am | 5:17:12 pm | 4:59:00 am | 5:57:26 pm | 15h 2m 14s | 🌒 (3%)Waxing Crescent: 3% illuminated at midnight, at the end of the day | 11:28:40 pm | 17.2° S | ||
| Wed, Nov 11 | 6:22:33 am | 7:00:19 am | +1m 50s | 3:56:28 pm | -1m 37s | 4:34:13 pm | 8h 56m 9s | -3m 28s | 11:28:43 am | 19.66° | 5:40:53 am | 5:15:50 pm | 5:00:33 am | 5:56:07 pm | 15h 5m 41s | 🌒 (7%)Waxing Crescent: 7% illuminated at midnight, at the end of the day | 11:28:47 pm | 17.5° S | ||
| Thu, Nov 12 | 6:24:14 am | 7:02:09 am | +1m 50s | 3:54:53 pm | -1m 35s | 4:32:47 pm | 8h 52m 44s | -3m 25s | 11:28:50 am | 19.39° | 5:42:28 am | 5:14:30 pm | 5:02:05 am | 5:54:51 pm | 15h 9m 6s | 🌒 (12%)Waxing Crescent: 12% illuminated at midnight, at the end of the day | 11:28:54 pm | 17.8° S | ||
| Fri, Nov 13 | 6:25:55 am | 7:03:59 am | +1m 50s | 3:53:21 pm | -1m 32s | 4:31:23 pm | 8h 49m 22s | -3m 23s | 11:28:58 am | 19.12° | 5:44:03 am | 5:13:13 pm | 5:03:36 am | 5:53:37 pm | 15h 12m 28s | 🌒 (19%)Waxing Crescent: 19% illuminated at midnight, at the end of the day | 11:29:03 pm | 18.0° S | ||
| Sat, Nov 14 | 6:27:36 am | 7:05:49 am | +1m 50s | 3:51:50 pm | -1m 31s | 4:30:02 pm | 8h 46m 1s | -3m 20s | 11:29:07 am | 18.86° | 5:45:37 am | 5:11:58 pm | 5:05:07 am | 5:52:25 pm | 15h 15m 47s | 🌒 (27%)Waxing Crescent: 27% illuminated at midnight, at the end of the day | 11:29:12 pm | 18.3° S | ||
| Sun, Nov 15 | 6:29:15 am | 7:07:37 am | +1m 48s | 3:50:22 pm | -1m 28s | 4:28:42 pm | 8h 42m 45s | -3m 17s | 11:29:17 am | 18.61° | 5:47:10 am | 5:10:45 pm | 5:06:37 am | 5:51:16 pm | 15h 19m 4s | 🌒 (36%)Waxing Crescent: 36% illuminated at midnight, at the end of the day | 11:29:23 pm | 18.5° S | ||
| Mon, Nov 16 | 6:30:54 am | 7:09:26 am | +1m 49s | 3:48:56 pm | -1m 26s | 4:27:26 pm | 8h 39m 30s | -3m 14s | 11:29:28 am | 18.35° | 5:48:43 am | 5:09:35 pm | 5:08:06 am | 5:50:10 pm | 15h 22m 17s | 🌒 (45%)Waxing Crescent: 45% illuminated at midnight, at the end of the day | 11:29:34 pm | 18.8° S | ||
| Tue, Nov 17 | 6:32:33 am | 7:11:13 am | +1m 47s | 3:47:32 pm | -1m 24s | 4:26:11 pm | 8h 36m 19s | -3m 11s | 11:29:40 am | 18.11° | 5:50:15 am | 5:08:28 pm | 5:09:34 am | 5:49:06 pm | 15h 25m 28s | 🌓 (55%) First quarter at 12:47 pmFirst quarter at 12:47 pm. At midnight, at the end of the day: 55% illuminated |
11:29:46 pm | 19.0° S | ||
| Wed, Nov 18 | 6:34:10 am | 7:13:00 am | +1m 47s | 3:46:11 pm | -1m 21s | 4:25:00 pm | 8h 33m 11s | -3m 8s | 11:29:52 am | 17.87° | 5:51:46 am | 5:07:22 pm | 5:11:01 am | 5:48:04 pm | 15h 28m 34s | 🌔 (65%)Waxing Gibbous: 65% illuminated at midnight, at the end of the day | 11:29:59 pm | 19.3° S | ||
| Thu, Nov 19 | 6:35:47 am | 7:14:45 am | +1m 45s | 3:44:53 pm | -1m 18s | 4:23:50 pm | 8h 30m 8s | -3m 4s | 11:30:05 am | 17.63° | 5:53:16 am | 5:06:20 pm | 5:12:28 am | 5:47:05 pm | 15h 31m 37s | 🌔 (74%)Waxing Gibbous: 74% illuminated at midnight, at the end of the day | 11:30:12 pm | 19.5° S | ||
| Fri, Nov 20 | 6:37:23 am | 7:16:30 am | +1m 45s | 3:43:37 pm | -1m 16s | 4:22:44 pm | 8h 27m 7s | -3m 1s | 11:30:19 am | 17.41° | 5:54:45 am | 5:05:20 pm | 5:13:53 am | 5:46:09 pm | 15h 34m 37s | 🌔 (83%)Waxing Gibbous: 83% illuminated at midnight, at the end of the day | 11:30:27 pm | 19.7° S | ||
| Sat, Nov 21 | 6:38:57 am | 7:18:14 am | +1m 44s | 3:42:24 pm | -1m 13s | 4:21:40 pm | 8h 24m 10s | -2m 57s | 11:30:34 am | 17.18° | 5:56:13 am | 5:04:22 pm | 5:15:18 am | 5:45:15 pm | 15h 37m 33s | 🌔 (90%)Waxing Gibbous: 90% illuminated at midnight, at the end of the day | 11:30:42 pm | 20.0° S | ||
| Sun, Nov 22 | 6:40:31 am | 7:19:57 am | +1m 43s | 3:41:13 pm | -1m 11s | 4:20:38 pm | 8h 21m 16s | -2m 53s | 11:30:50 am | 16.97° | 5:57:40 am | 5:03:27 pm | 5:16:41 am | 5:44:24 pm | 15h 40m 26s | 🌔 (96%)Waxing Gibbous: 96% illuminated at midnight, at the end of the day | 11:30:59 pm | 20.2° S | ||
| Mon, Nov 23 | 6:42:04 am | 7:21:39 am | +1m 42s | 3:40:06 pm | -1m 7s | 4:19:39 pm | 8h 18m 27s | -2m 49s | 11:31:07 am | 16.76° | 5:59:06 am | 5:02:35 pm | 5:18:04 am | 5:43:36 pm | 15h 43m 13s | 🌔 (99%)Waxing Gibbous: 99% illuminated at midnight, at the end of the day | 11:31:16 pm | 20.4° S | ||
| Tue, Nov 24 | 6:43:35 am | 7:23:19 am | +1m 40s | 3:39:01 pm | -1m 5s | 4:18:43 pm | 8h 15m 42s | -2m 45s | 11:31:24 am | 16.55° | 6:00:31 am | 5:01:46 pm | 5:19:25 am | 5:42:50 pm | 15h 45m 57s | 🌕 (99.6%) Full moon at 3:53 pmFull moon at 3:53 pm. At midnight, at the end of the day: 99.6% illuminated |
11:31:33 pm | 20.6° S | ||
| Wed, Nov 25 | 6:45:05 am | 7:24:58 am | +1m 39s | 3:37:59 pm | -1m 2s | 4:17:50 pm | 8h 13m 1s | -2m 41s | 11:31:42 am | 16.36° | 6:01:55 am | 5:00:59 pm | 5:20:45 am | 5:42:07 pm | 15h 48m 36s | 🌖 (97%)Waning Gibbous: 97% illuminated at midnight, at the end of the day | 11:31:52 pm | 20.8° S | ||
| Thu, Nov 26 | 6:46:34 am | 7:26:35 am | +1m 37s | 3:36:59 pm | -1m 0s | 4:17:00 pm | 8h 10m 24s | -2m 37s | 11:32:01 am | 16.17° | 6:03:18 am | 5:00:15 pm | 5:22:04 am | 5:41:27 pm | 15h 51m 12s | 🌖 (92%)Waning Gibbous: 92% illuminated at midnight, at the end of the day | 11:32:11 pm | 21.0° S | ||
| Fri, Nov 27 | 6:48:02 am | 7:28:11 am | +1m 36s | 3:36:03 pm | -56s | 4:16:12 pm | 8h 7m 52s | -2m 32s | 11:32:20 am | 15.98° | 6:04:39 am | 4:59:34 pm | 5:23:22 am | 5:40:49 pm | 15h 53m 43s | 🌖 (84%)Waning Gibbous: 84% illuminated at midnight, at the end of the day | 11:32:30 pm | 21.2° S | ||
| Sat, Nov 28 | 6:49:27 am | 7:29:46 am | +1m 35s | 3:35:10 pm | -53s | 4:15:28 pm | 8h 5m 24s | -2m 27s | 11:32:40 am | 15.80° | 6:05:59 am | 4:58:55 pm | 5:24:38 am | 5:40:14 pm | 15h 56m 8s | 🌖 (75%)Waning Gibbous: 75% illuminated at midnight, at the end of the day | 11:32:51 pm | 21.3° S | ||
| Sun, Nov 29 | 6:50:52 am | 7:31:18 am | +1m 32s | 3:34:20 pm | -50s | 4:14:46 pm | 8h 3m 2s | -2m 23s | 11:33:01 am | 15.63° | 6:07:18 am | 4:58:19 pm | 5:25:53 am | 5:39:42 pm | 15h 58m 29s | 🌖 (64%)Waning Gibbous: 64% illuminated at midnight, at the end of the day | 11:33:12 pm | 21.5° S | ||
| Mon, Nov 30 | 6:52:15 am | 7:32:49 am | +1m 31s | 3:33:34 pm | -46s | 4:14:08 pm | 8h 0m 45s | -2m 18s | 11:33:23 am | 15.47° | 6:08:35 am | 4:57:47 pm | 5:27:07 am | 5:39:13 pm | 16h 0m 44s | 🌖 (53%)Waning Gibbous: 53% illuminated at midnight, at the end of the day | 11:33:34 pm | 21.7° S |
Got a cool idea? 💡 Found any errors? 🤦
We're always improving this website!
Year distribution of sunrise and sunset times in Raciążek, Kujawsko-Pomorskie - 2026
The following graph shows sunrise and sunset times in Raciążek, Kujawsko-Pomorskie for every day of the year. There are two jumps in the graph that represent the hour change for Daylight Saving Time (DST) in Raciążek, Kujawsko-Pomorskie.
Daylight Dawn & dusk (civil twilight) Night Solar noon · Vertical steps in the curves = DST clock change
Earliest and latest sunrise and sunset in Raciążek
In Raciążek, the earliest sunrise of 2026 is on June 17 at 4:19 am, while the latest sunrise is on December 30 at 7:57 am. The earliest sunset is on December 13 at 3:28 pm, and the latest sunset is on June 24 at 9:14 pm.
Raciążek gets 9h 18m more daylight on the longest day than on the shortest one (16h 54m versus 7h 35m). Averaged over the whole year, a day lasts 12h 17m.
Raciążek Analemma
Due to Earth's tilted axis and slightly elliptical orbit, the Sun is never seen in the same position at noon in Raciążek. Throughout the year, it slowly traces this figure-eight:
Move along the curve to read the Sun's altitude and azimuth for any day of the year in Raciążek.
Over the year, the 12:00 Sun swings between just 13.6° above the horizon (around Dec 20) and 60.5° (around Jun 20) in Raciążek. The smaller loop sits at the top, the signature of a Northern Hemisphere analemma.
Detailed Analemma Chart
The technical chart below plots one dot per day, labels the first day of each month, marks the solstices, equinoxes, perihelion and aphelion, and draws the noon altitude of the equinoxes (90° minus your latitude) together with its ±23.4° seasonal limits.
Why does the figure look wider here than in the sky view above?
Both draw the same data, but with different conventions. The sky view uses the same scale on both axes, so it shows the analemma with its true proportions, as a camera would capture it: about 47° tall and only a few degrees wide. This chart, like most technical analemma diagrams, stretches each axis independently to fill the plot, expanding the narrow azimuth range several times so its day-to-day variation can actually be read. Also, azimuth is not sky distance: near the zenith, one degree of azimuth spans much less than one degree across the sky, which further widens the figure in this representation.
Places near Raciążek, Kujawsko-Pomorskie
These nearby towns and cities have almost the same sunrise and sunset times as Raciążek, Kujawsko-Pomorskie — the difference is only seconds to a couple of minutes. Select any place to see its own sun calendar:
Ciechocinek 3 kmNieszawa 6 kmWaganiec 7 kmOsiek 8 kmAleksandrów Kujawski 8 kmKoneck 10 kmBobrowniki 13 kmCzernikowo 13 km
Larger cities around Raciążek, and how much earlier or later the sun sets there today:
Toruń same sunsetWłocławek same sunsetBydgoszcz 2 min laterPłock 2 min earlierGrudziądz 2 min earlier
