Sunrise and sunset times in Raciąż
EditCheck out today's and tomorrow's sunrise and sunset times in Raciąż, as well as the whole calendar for November 2026.
Today
November 18, 2026. Current time: 3:16:40 pm
Night ends at 5:16 am5:15:55 am
Start of astronomical twilight: the Sun is 18° below the horizon and the sky begins to brighten, too faintly to notice in a city.·First light at 6:41 am6:40:43 am
Start of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.
Sunrise time: 7:20:29 amWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley).
Sunset time: 3:46:54 pmWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley).
Dark at 4:27 pm4:26:38 pm
End of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.·Night at 5:51 pm5:51:22 pm
End of astronomical twilight: the Sun is 18° below the horizon and the sky is dark enough to see the faintest stars. In a city it looks dark sooner.
Sun position chart
Now · Sun altitude: 2.81° · Azimuth: 231.27° (SW)
Daylight Golden Hour Blue Hour Twilight Night
Day length: 8 hours, 26 minutes
30 minutes left for today's sunset in Raciąż
Tomorrow
November 19, 2026
Night ends at 5:17 am5:17:24 am
Start of astronomical twilight: the Sun is 18° below the horizon and the sky begins to brighten, too faintly to notice in a city.·First light at 6:42 am6:42:23 am
Start of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.
Sunrise time: 7:22:19 amWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley).
Sunset time: 3:45:32 pmWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley).
Dark at 4:25 pm4:25:26 pm
End of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.·Night at 5:50 pm5:50:21 pm
End of astronomical twilight: the Sun is 18° below the horizon and the sky is dark enough to see the faintest stars. In a city it looks dark sooner.
Day length: 8 hours, 23 minutes
Tomorrow will be 3 minutes shorter than today in Raciąż
- Raciąż, Kujawsko-Pomorskie
- Latitude: 53.662041 (North)
- Longitude: 17.786869 (East)
- Time zone: Central European Standard Time (CET, UTC+1)
Shortest day in Raciąż, Kujawsko-Pomorskie
The shortest day of the year will be in 1 month and 3 days, during the winter solstice on December 21, 2026, with a daylight length of 7 hours, 26 minutes.Longest day in Raciąż, Kujawsko-Pomorskie
The longest day of the year was around 4 months ago, during the summer solstice on June 21, 2026, with a daylight length of 17 hours, 4 minutes.November 2026 - Raciąż, Kujawsko-Pomorskie - Sunrise and sunset calendar
Sunrise and sunset times, civil twilight start and end times as well as solar noon, and day length for every day of November in Raciąż.
All times are in Raciąż's time: Central European Standard Time (CET, UTC+1).
The day length shortens by 1 hour, 35 minutes over the course of November 2026 in Raciąż, Kujawsko-Pomorskie - from 9 hours, 27 minutes on the first day to 7 hours, 52 minutes on the last day.
| Day | First LightStart of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light. | SunriseWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley). | Sunrise Variation |
SunsetWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley). | Sunset Variation |
Last LightEnd of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors. | Day Length | Day Length Variation | Solar NoonTime of day when the sun reaches its highest point in the sky. | Max Sun Altitude | Nautical Twilight Start | Nautical Twilight End | Astronomical Twilight Start | Astronomical Twilight End | Night LengthCalculated from this day's sunset to the next day's sunrise. | Moon phase | Solar Midnight | Sun DeclinationThe latitude where the Sun is directly overhead at solar noon (the Sun's declination). It moves between the two tropics through the year. | Moonrise | Moonset |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sun, Nov 1 | Twilight startStart of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.6:11:00 am | 6:48:11 am | +1m 56s | 4:15:49 pm | -1m 59s | Twilight endEnd of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.4:52:58 pm | 9h 27m 38s | -3m 55s | Solar noonTime of day when the sun reaches its highest point in the sky.11:32:23 am | 21.84° | 5:29:29 am | 5:34:25 pm | 4:48:48 am | 6:15:01 pm | Night lengthCalculated from this day's sunset to the next day's sunrise.14h 34m 17s | 🌗 (49%) Last quarter at 9:28 pmLast quarter at 9:28 pm. At midnight, at the end of the day: 49% illuminated |
11:32:23 pm | 14.5° S | ||
| Mon, Nov 2 | 6:12:48 am | 6:50:06 am | +1m 55s | 4:13:52 pm | -1m 57s | 4:51:08 pm | 9h 23m 46s | -3m 53s | 11:32:22 am | 21.52° | 5:31:11 am | 5:32:41 pm | 4:50:28 am | 6:13:19 pm | 14h 38m 10s | 🌘 (38%)Waning Crescent: 38% illuminated at midnight, at the end of the day | 11:32:22 pm | 14.8° S | ||
| Tue, Nov 3 | 6:14:35 am | 6:52:02 am | +1m 56s | 4:11:56 pm | -1m 56s | 4:49:21 pm | 9h 19m 54s | -3m 51s | 11:32:22 am | 21.21° | 5:32:53 am | 5:30:59 pm | 4:52:08 am | 6:11:40 pm | 14h 42m 2s | 🌘 (28%)Waning Crescent: 28% illuminated at midnight, at the end of the day | 11:32:22 pm | 15.1° S | ||
| Wed, Nov 4 | 6:16:22 am | 6:53:58 am | +1m 56s | 4:10:02 pm | -1m 54s | 4:47:35 pm | 9h 16m 4s | -3m 50s | 11:32:22 am | 20.90° | 5:34:35 am | 5:29:19 pm | 4:53:48 am | 6:10:02 pm | 14h 45m 51s | 🌘 (19%)Waning Crescent: 19% illuminated at midnight, at the end of the day | 11:32:23 pm | 15.4° S | ||
| Thu, Nov 5 | 6:18:09 am | 6:55:53 am | +1m 55s | 4:08:10 pm | -1m 52s | 4:45:52 pm | 9h 12m 17s | -3m 48s | 11:32:23 am | 20.59° | 5:36:16 am | 5:27:41 pm | 4:55:27 am | 6:08:26 pm | 14h 49m 39s | 🌘 (11%)Waning Crescent: 11% illuminated at midnight, at the end of the day | 11:32:25 pm | 15.7° S | ||
| Fri, Nov 6 | 6:19:56 am | 6:57:49 am | +1m 56s | 4:06:19 pm | -1m 51s | 4:44:10 pm | 9h 8m 30s | -3m 46s | 11:32:26 am | 20.29° | 5:37:57 am | 5:26:06 pm | 4:57:06 am | 6:06:53 pm | 14h 53m 25s | 🌘 (6%)Waning Crescent: 6% illuminated at midnight, at the end of the day | 11:32:28 pm | 16.0° S | ||
| Sat, Nov 7 | 6:21:43 am | 6:59:44 am | +1m 55s | 4:04:31 pm | -1m 48s | 4:42:30 pm | 9h 4m 47s | -3m 44s | 11:32:29 am | 19.99° | 5:39:38 am | 5:24:32 pm | 4:58:44 am | 6:05:22 pm | 14h 57m 9s | 🌘 (2%)Waning Crescent: 2% illuminated at midnight, at the end of the day | 11:32:31 pm | 16.3° S | ||
| Sun, Nov 8 | 6:23:29 am | 7:01:40 am | +1m 56s | 4:02:44 pm | -1m 47s | 4:40:52 pm | 9h 1m 4s | -3m 42s | 11:32:33 am | 19.70° | 5:41:18 am | 5:23:01 pm | 5:00:21 am | 6:03:54 pm | 15h 0m 51s | 🌘 (0.3%)Waning Crescent: 0.3% illuminated at midnight, at the end of the day | 11:32:35 pm | 16.6° S | ||
| Mon, Nov 9 | 6:25:15 am | 7:03:35 am | +1m 55s | 4:00:59 pm | -1m 45s | 4:39:17 pm | 8h 57m 24s | -3m 40s | 11:32:37 am | 19.42° | 5:42:58 am | 5:21:31 pm | 5:01:58 am | 6:02:28 pm | 15h 4m 30s | 🌑 (1%) New moon at 8:02 amNew moon at 8:02 am. At midnight, at the end of the day: 1% illuminated |
11:32:40 pm | 16.9° S | ||
| Tue, Nov 10 | 6:27:00 am | 7:05:29 am | +1m 54s | 3:59:16 pm | -1m 43s | 4:37:43 pm | 8h 53m 47s | -3m 38s | 11:32:43 am | 19.13° | 5:44:37 am | 5:20:04 pm | 5:03:34 am | 6:01:04 pm | 15h 8m 8s | 🌒 (3%)Waxing Crescent: 3% illuminated at midnight, at the end of the day | 11:32:46 pm | 17.2° S | ||
| Wed, Nov 11 | 6:28:45 am | 7:07:24 am | +1m 55s | 3:57:36 pm | -1m 40s | 4:36:12 pm | 8h 50m 12s | -3m 35s | 11:32:49 am | 18.86° | 5:46:15 am | 5:18:40 pm | 5:05:09 am | 5:59:42 pm | 15h 11m 42s | 🌒 (7%)Waxing Crescent: 7% illuminated at midnight, at the end of the day | 11:32:53 pm | 17.5° S | ||
| Thu, Nov 12 | 6:30:30 am | 7:09:18 am | +1m 54s | 3:55:57 pm | -1m 39s | 4:34:43 pm | 8h 46m 39s | -3m 33s | 11:32:57 am | 18.58° | 5:47:53 am | 5:17:17 pm | 5:06:44 am | 5:58:23 pm | 15h 15m 14s | 🌒 (12%)Waxing Crescent: 12% illuminated at midnight, at the end of the day | 11:33:01 pm | 17.8° S | ||
| Fri, Nov 13 | 6:32:14 am | 7:11:11 am | +1m 53s | 3:54:21 pm | -1m 36s | 4:33:16 pm | 8h 43m 10s | -3m 30s | 11:33:05 am | 18.32° | 5:49:30 am | 5:15:57 pm | 5:08:18 am | 5:57:07 pm | 15h 18m 43s | 🌒 (19%)Waxing Crescent: 19% illuminated at midnight, at the end of the day | 11:33:10 pm | 18.0° S | ||
| Sat, Nov 14 | 6:33:57 am | 7:13:04 am | +1m 53s | 3:52:47 pm | -1m 34s | 4:31:52 pm | 8h 39m 43s | -3m 27s | 11:33:14 am | 18.06° | 5:51:07 am | 5:14:40 pm | 5:09:51 am | 5:55:53 pm | 15h 22m 9s | 🌒 (27%)Waxing Crescent: 27% illuminated at midnight, at the end of the day | 11:33:19 pm | 18.3° S | ||
| Sun, Nov 15 | 6:35:40 am | 7:14:56 am | +1m 52s | 3:51:15 pm | -1m 32s | 4:30:30 pm | 8h 36m 19s | -3m 24s | 11:33:24 am | 17.80° | 5:52:43 am | 5:13:25 pm | 5:11:23 am | 5:54:41 pm | 15h 25m 33s | 🌒 (36%)Waxing Crescent: 36% illuminated at midnight, at the end of the day | 11:33:29 pm | 18.5° S | ||
| Mon, Nov 16 | 6:37:22 am | 7:16:48 am | +1m 52s | 3:49:45 pm | -1m 30s | 4:29:10 pm | 8h 32m 57s | -3m 21s | 11:33:34 am | 17.55° | 5:54:18 am | 5:12:12 pm | 5:12:54 am | 5:53:33 pm | 15h 28m 54s | 🌒 (45%)Waxing Crescent: 45% illuminated at midnight, at the end of the day | 11:33:40 pm | 18.8° S | ||
| Tue, Nov 17 | 6:39:03 am | 7:18:39 am | +1m 51s | 3:48:18 pm | -1m 27s | 4:27:53 pm | 8h 29m 39s | -3m 18s | 11:33:46 am | 17.30° | 5:55:52 am | 5:11:02 pm | 5:14:25 am | 5:52:26 pm | 15h 32m 11s | 🌓 (55%) First quarter at 12:47 pmFirst quarter at 12:47 pm. At midnight, at the end of the day: 55% illuminated |
11:33:53 pm | 19.0° S | ||
| Wed, Nov 18 | 6:40:43 am | 7:20:29 am | +1m 50s | 3:46:54 pm | -1m 24s | 4:26:38 pm | 8h 26m 25s | -3m 15s | 11:33:59 am | 17.06° | 5:57:26 am | 5:09:54 pm | 5:15:55 am | 5:51:22 pm | 15h 35m 25s | 🌔 (65%)Waxing Gibbous: 65% illuminated at midnight, at the end of the day | 11:34:06 pm | 19.3° S | ||
| Thu, Nov 19 | 6:42:23 am | 7:22:19 am | +1m 50s | 3:45:32 pm | -1m 22s | 4:25:26 pm | 8h 23m 13s | -3m 11s | 11:34:12 am | 16.83° | 5:58:58 am | 5:08:49 pm | 5:17:24 am | 5:50:21 pm | 15h 38m 35s | 🌔 (74%)Waxing Gibbous: 74% illuminated at midnight, at the end of the day | 11:34:19 pm | 19.5° S | ||
| Fri, Nov 20 | 6:44:01 am | 7:24:07 am | +1m 48s | 3:44:13 pm | -1m 19s | 4:24:17 pm | 8h 20m 6s | -3m 8s | 11:34:26 am | 16.60° | 6:00:30 am | 5:07:47 pm | 5:18:51 am | 5:49:23 pm | 15h 41m 41s | 🌔 (83%)Waxing Gibbous: 83% illuminated at midnight, at the end of the day | 11:34:34 pm | 19.7° S | ||
| Sat, Nov 21 | 6:45:39 am | 7:25:54 am | +1m 47s | 3:42:56 pm | -1m 17s | 4:23:10 pm | 8h 17m 2s | -3m 4s | 11:34:41 am | 16.38° | 6:02:00 am | 5:06:47 pm | 5:20:18 am | 5:48:27 pm | 15h 44m 44s | 🌔 (90%)Waxing Gibbous: 90% illuminated at midnight, at the end of the day | 11:34:49 pm | 20.0° S | ||
| Sun, Nov 22 | 6:47:15 am | 7:27:40 am | +1m 46s | 3:41:42 pm | -1m 14s | 4:22:06 pm | 8h 14m 2s | -3m 0s | 11:34:56 am | 16.16° | 6:03:30 am | 5:05:50 pm | 5:21:44 am | 5:47:34 pm | 15h 47m 43s | 🌔 (96%)Waxing Gibbous: 96% illuminated at midnight, at the end of the day | 11:35:05 pm | 20.2° S | ||
| Mon, Nov 23 | 6:48:50 am | 7:29:25 am | +1m 45s | 3:40:31 pm | -1m 11s | 4:21:05 pm | 8h 11m 6s | -2m 56s | 11:35:13 am | 15.95° | 6:04:58 am | 5:04:55 pm | 5:23:08 am | 5:46:43 pm | 15h 50m 38s | 🌔 (99%)Waxing Gibbous: 99% illuminated at midnight, at the end of the day | 11:35:22 pm | 20.4° S | ||
| Tue, Nov 24 | 6:50:24 am | 7:31:09 am | +1m 44s | 3:39:23 pm | -1m 8s | 4:20:06 pm | 8h 8m 14s | -2m 52s | 11:35:30 am | 15.75° | 6:06:25 am | 5:04:04 pm | 5:24:31 am | 5:45:56 pm | 15h 53m 28s | 🌕 (99.6%) Full moon at 3:53 pmFull moon at 3:53 pm. At midnight, at the end of the day: 99.6% illuminated |
11:35:39 pm | 20.6° S | ||
| Wed, Nov 25 | 6:51:57 am | 7:32:51 am | +1m 42s | 3:38:18 pm | -1m 5s | 4:19:11 pm | 8h 5m 27s | -2m 47s | 11:35:48 am | 15.55° | 6:07:51 am | 5:03:15 pm | 5:25:54 am | 5:45:11 pm | 15h 56m 13s | 🌖 (97%)Waning Gibbous: 97% illuminated at midnight, at the end of the day | 11:35:58 pm | 20.8° S | ||
| Thu, Nov 26 | 6:53:28 am | 7:34:31 am | +1m 40s | 3:37:16 pm | -1m 2s | 4:18:18 pm | 8h 2m 45s | -2m 43s | 11:36:07 am | 15.36° | 6:09:16 am | 5:02:29 pm | 5:27:14 am | 5:44:29 pm | 15h 58m 54s | 🌖 (92%)Waning Gibbous: 92% illuminated at midnight, at the end of the day | 11:36:17 pm | 21.0° S | ||
| Fri, Nov 27 | 6:54:58 am | 7:36:10 am | +1m 39s | 3:36:17 pm | -59s | 4:17:28 pm | 8h 0m 7s | -2m 38s | 11:36:27 am | 15.17° | 6:10:39 am | 5:01:46 pm | 5:28:34 am | 5:43:49 pm | 16h 1m 31s | 🌖 (84%)Waning Gibbous: 84% illuminated at midnight, at the end of the day | 11:36:37 pm | 21.2° S | ||
| Sat, Nov 28 | 6:56:26 am | 7:37:48 am | +1m 38s | 3:35:21 pm | -56s | 4:16:41 pm | 7h 57m 33s | -2m 33s | 11:36:47 am | 15.00° | 6:12:01 am | 5:01:05 pm | 5:29:52 am | 5:43:13 pm | 16h 4m 2s | 🌖 (75%)Waning Gibbous: 75% illuminated at midnight, at the end of the day | 11:36:58 pm | 21.3° S | ||
| Sun, Nov 29 | 6:57:53 am | 7:39:23 am | +1m 35s | 3:34:28 pm | -53s | 4:15:57 pm | 7h 55m 5s | -2m 28s | 11:37:08 am | 14.83° | 6:13:22 am | 5:00:28 pm | 5:31:09 am | 5:42:39 pm | 16h 6m 29s | 🌖 (64%)Waning Gibbous: 64% illuminated at midnight, at the end of the day | 11:37:19 pm | 21.5° S | ||
| Mon, Nov 30 | 6:59:18 am | 7:40:57 am | +1m 34s | 3:33:38 pm | -50s | 4:15:17 pm | 7h 52m 41s | -2m 23s | 11:37:29 am | 14.66° | 6:14:40 am | 4:59:53 pm | 5:32:24 am | 5:42:08 pm | 16h 8m 51s | 🌖 (53%)Waning Gibbous: 53% illuminated at midnight, at the end of the day | 11:37:40 pm | 21.7° S |
Got a cool idea? 💡 Found any errors? 🤦
We're always improving this website!
Year distribution of sunrise and sunset times in Raciąż, Kujawsko-Pomorskie - 2026
The following graph shows sunrise and sunset times in Raciąż, Kujawsko-Pomorskie for every day of the year. There are two jumps in the graph that represent the hour change for Daylight Saving Time (DST) in Raciąż, Kujawsko-Pomorskie.
Daylight Dawn & dusk (civil twilight) Night Solar noon · Vertical steps in the curves = DST clock change
Earliest and latest sunrise and sunset in Raciąż, Kujawsko-Pomorskie
In Raciąż, Kujawsko-Pomorskie, the earliest sunrise of 2026 is on June 17 at 4:18 am, while the latest sunrise is on December 29 at 8:06 am. The earliest sunset is on December 13 at 3:28 pm, and the latest sunset is on June 24 at 9:23 pm.
Raciąż, Kujawsko-Pomorskie gets 9h 38m more daylight on the longest day than on the shortest one (17h 04m versus 7h 26m). Averaged over the whole year, a day lasts 12h 17m.
Raciąż Analemma
Due to Earth's tilted axis and slightly elliptical orbit, the Sun is never seen in the same position at noon in Raciąż. Throughout the year, it slowly traces this figure-eight:
Move along the curve to read the Sun's altitude and azimuth for any day of the year in Raciąż.
Over the year, the 12:00 Sun swings between just 12.9° above the horizon (around Dec 20) and 59.7° (around Jun 20) in Raciąż. The smaller loop sits at the top, the signature of a Northern Hemisphere analemma.
Detailed Analemma Chart
The technical chart below plots one dot per day, labels the first day of each month, marks the solstices, equinoxes, perihelion and aphelion, and draws the noon altitude of the equinoxes (90° minus your latitude) together with its ±23.4° seasonal limits.
Why does the figure look wider here than in the sky view above?
Both draw the same data, but with different conventions. The sky view uses the same scale on both axes, so it shows the analemma with its true proportions, as a camera would capture it: about 47° tall and only a few degrees wide. This chart, like most technical analemma diagrams, stretches each axis independently to fill the plot, expanding the narrow azimuth range several times so its day-to-day variation can actually be read. Also, azimuth is not sky distance: near the zenith, one degree of azimuth spans much less than one degree across the sky, which further widens the figure in this representation.
Places near Raciąż, Kujawsko-Pomorskie
These nearby towns and cities have almost the same sunrise and sunset times as Raciąż, Kujawsko-Pomorskie — the difference is only seconds to a couple of minutes. Select any place to see its own sun calendar:
Ostrowite 8 kmTuchola 10 kmKęsowo 12 kmChojnice 16 kmCekcyn 18 kmGostycyn 19 kmCzersk 19 kmKamienica 20 km
Larger cities around Raciąż, and how much earlier or later the sun sets there today:
Bydgoszcz 1 min laterGrudziądz 3 min earlierPiła 6 min laterToruń 1 min earlierGdańsk 6 min earlier
