Sunrise and sunset times in Raciąż

Check out today's and tomorrow's sunrise and sunset times in Raciąż, as well as the whole calendar for November 2026.

Today

November 23, 2026. Current time: 12:20:00 am

Sun rising over the horizon

Night ends at 5:13 am5:12:45 am
Start of astronomical twilight: the Sun is 18° below the horizon and the sky begins to brighten, too faintly to notice in a city.
·First light at 6:37 am6:36:36 am
Dawn, the start of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.

Sunrise time: 7:16:05 amWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley).

Sun setting behind the horizon

Sunset time: 3:35:13 pmWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley).

Dark at 4:15 pm4:14:41 pm
Dusk, the end of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.
·Night at 5:38 pm5:38:28 pm
End of astronomical twilight: the Sun is 18° below the horizon and the sky is dark enough to see the faintest stars. In a city it looks dark sooner.

Sun position chart

3 am6 am9 am12 pm3 pm6 pm9 pm-60°-40°-20°0°20°Solar noon11:25 amSunrise7:16 amSunset3:35 pmSolar midnight11:26 pm

Now · Sun altitude: -55.86° (below the horizon) · Azimuth: 23.05° (NE)

Daylight   Golden Hour   Blue Hour   Twilight   Night

Day length: 8 hours, 19 minutes

6 hours, 56 minutes left until today's sunrise in Raciąż

Moonset icon Moonset: 5:52 amMoonrise icon Moonrise: 2:16 pmMoon phase: 🌔 Waxing Gibbous (96%)🌕 Full moon: Nov 24 at 3:53 pm · 🌑 New moon: Dec 9 at 1:51 am

Tomorrow

November 24, 2026

Sun rising over the horizon

Night ends at 5:14 am5:14:06 am
Start of astronomical twilight: the Sun is 18° below the horizon and the sky begins to brighten, too faintly to notice in a city.
·First light at 6:38 am6:38:07 am
Dawn, the start of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.

Sunrise time: 7:17:45 amWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley).

Sun setting behind the horizon

Sunset time: 3:34:08 pmWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley).

Dark at 4:14 pm4:13:46 pm
Dusk, the end of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.
·Night at 5:38 pm5:37:43 pm
End of astronomical twilight: the Sun is 18° below the horizon and the sky is dark enough to see the faintest stars. In a city it looks dark sooner.

Day length: 8 hours, 16 minutes

Tomorrow will be 3 minutes shorter than today in Raciąż

Moonset icon Moonset: 7:25 amMoonrise icon Moonrise: 2:46 pmMoon phase: 🌕 Full Moon (99.6%)
Map of Raciąż, Mazovia

Day and night world map


Shortest day in Raciąż, Mazovia

The shortest day of the year will be in 28 days, during the winter solstice on December 21, 2026, with a daylight length of 7 hours, 36 minutes.

Longest day in Raciąż, Mazovia

The longest day of the year was around 5 months ago, during the summer solstice on June 21, 2026, with a daylight length of 16 hours, 53 minutes.
How Long After Sunset Does It Get Dark?

How Long After Sunset Does It Get Dark?

When Is the Shortest Day of the Year?

When Is the Shortest Day of the Year?

Why the Shortest Day Is Not the Day With the Earliest Sunset or Latest Sunrise

Why the Shortest Day Is Not the Day With the Earliest Sunset or Latest Sunrise

Total Solar Eclipse of August 2, 2027: Path, Times and Best Places

The Total Solar Eclipse of August 2, 2027

How Many Minutes Before Sunrise Is It Pretty?

How Many Minutes Before Sunrise Is It Pretty?

What Do Pink Sunsets Mean?

What Do Pink Sunsets Mean?

All articles →


November 2026 - Raciąż, Mazovia - Sunrise and sunset calendar

Sunrise and sunset times, civil twilight start and end times as well as solar noon, and day length for every day of November in Raciąż.

All times are in Raciąż's time: Central European Standard Time (CET, UTC+1).

The day length shortens by 1 hour, 31 minutes over the course of November 2026 in Raciąż, Mazovia - from 9 hours, 32 minutes on the first day to 8 hours, 1 minute on the last day.

« October 2026Oct 2026

Today

December 2026Dec 2026 »

Day First LightStart of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light. SunriseWhen the top edge of the Sun appears over a flat, clear horizon. Behind hills, mountains or buildings the Sun appears a few minutes later (or more in a valley). Sunrise
Variation
SunsetWhen the top edge of the Sun disappears below a flat, clear horizon. Behind hills, mountains or buildings the Sun disappears a few minutes earlier (or more in a valley). Sunset
Variation
Last LightEnd of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors. Day Length Day Length Variation Solar NoonTime of day when the sun reaches its highest point in the sky. Max Sun Altitude Nautical Twilight Start Nautical Twilight End Astronomical Twilight Start Astronomical Twilight End Night LengthCalculated from this day's sunset to the next day's sunrise. Moon phase Solar Midnight Sun DeclinationThe latitude where the Sun is directly overhead at solar noon (the Sun's declination). It moves between the two tropics through the year.MoonriseMoonset
Sun, Nov 1 Twilight startStart of civil twilight: the Sun is 6° below the horizon, and there is enough light to be outdoors without artificial light.5:59:58 am 6:36:18 am +1m 52s 4:09:05 pm -1m 55s Twilight endEnd of civil twilight: the Sun reaches 6° below the horizon, and from then on artificial light is needed outdoors.4:45:23 pm 9h 32m 47s -3m 46s Solar noonTime of day when the sun reaches its highest point in the sky.11:23:04 am 22.72° 5:19:18 am 5:25:58 pm 4:39:27 am 6:05:45 pm Night lengthCalculated from this day's sunset to the next day's sunrise.14h 29m 4s 🌗 (49%)
Last quarter at 9:28 pm
Last quarter at 9:28 pm. At midnight, at the end of the day: 49% illuminated
11:23:04 pm 14.5° S
Mon, Nov 2 6:01:42 am 6:38:09 am +1m 51s 4:07:12 pm -1m 53s 4:43:37 pm 9h 29m 3s -3m 45s 11:23:03 am 22.40° 5:20:57 am 5:24:18 pm 4:41:04 am 6:04:07 pm 14h 32m 49s 🌘 (38%)Waning Crescent: 38% illuminated at midnight, at the end of the day 11:23:03 pm 14.8° S
Tue, Nov 3 6:03:26 am 6:40:01 am +1m 52s 4:05:20 pm -1m 52s 4:41:53 pm 9h 25m 19s -3m 43s 11:23:02 am 22.09° 5:22:36 am 5:22:39 pm 4:42:41 am 6:02:30 pm 14h 36m 32s 🌘 (28%)Waning Crescent: 28% illuminated at midnight, at the end of the day 11:23:03 pm 15.1° S
Wed, Nov 4 6:05:09 am 6:41:52 am +1m 51s 4:03:30 pm -1m 50s 4:40:11 pm 9h 21m 38s -3m 42s 11:23:03 am 21.78° 5:24:15 am 5:21:02 pm 4:44:17 am 6:00:56 pm 14h 40m 14s 🌘 (19%)Waning Crescent: 19% illuminated at midnight, at the end of the day 11:23:04 pm 15.4° S
Thu, Nov 5 6:06:53 am 6:43:44 am +1m 52s 4:01:42 pm -1m 48s 4:38:31 pm 9h 17m 58s -3m 40s 11:23:04 am 21.47° 5:25:53 am 5:19:28 pm 4:45:53 am 5:59:23 pm 14h 43m 53s 🌘 (11%)Waning Crescent: 11% illuminated at midnight, at the end of the day 11:23:05 pm 15.7° S
Fri, Nov 6 6:08:36 am 6:45:35 am +1m 51s 3:59:55 pm -1m 47s 4:36:52 pm 9h 14m 20s -3m 38s 11:23:06 am 21.17° 5:27:31 am 5:17:55 pm 4:47:29 am 5:57:53 pm 14h 47m 32s 🌘 (6%)Waning Crescent: 6% illuminated at midnight, at the end of the day 11:23:08 pm 16.0° S
Sat, Nov 7 6:10:19 am 6:47:27 am +1m 52s 3:58:11 pm -1m 44s 4:35:16 pm 9h 10m 44s -3m 36s 11:23:09 am 20.88° 5:29:08 am 5:16:25 pm 4:49:03 am 5:56:25 pm 14h 51m 7s 🌘 (2%)Waning Crescent: 2% illuminated at midnight, at the end of the day 11:23:11 pm 16.3° S
Sun, Nov 8 6:12:02 am 6:49:18 am +1m 51s 3:56:28 pm -1m 43s 4:33:42 pm 9h 7m 10s -3m 34s 11:23:13 am 20.59° 5:30:45 am 5:14:56 pm 4:50:38 am 5:55:00 pm 14h 54m 41s 🌘 (0.3%)Waning Crescent: 0.3% illuminated at midnight, at the end of the day 11:23:16 pm 16.6° S
Mon, Nov 9 6:13:44 am 6:51:09 am +1m 51s 3:54:47 pm -1m 41s 4:32:10 pm 9h 3m 38s -3m 32s 11:23:18 am 20.30° 5:32:21 am 5:13:30 pm 4:52:11 am 5:53:37 pm 14h 58m 12s 🌑 (1%)
New moon at 8:02 am
New moon at 8:02 am. At midnight, at the end of the day: 1% illuminated
11:23:21 pm 16.9° S
Tue, Nov 10 6:15:26 am 6:52:59 am +1m 50s 3:53:09 pm -1m 38s 4:30:40 pm 9h 0m 10s -3m 29s 11:23:23 am 20.02° 5:33:57 am 5:12:06 pm 4:53:44 am 5:52:16 pm 15h 1m 41s 🌒 (3%)Waxing Crescent: 3% illuminated at midnight, at the end of the day 11:23:27 pm 17.2° S
Wed, Nov 11 6:17:08 am 6:54:50 am +1m 51s 3:51:32 pm -1m 37s 4:29:12 pm 8h 56m 42s -3m 27s 11:23:30 am 19.74° 5:35:33 am 5:10:44 pm 4:55:17 am 5:50:57 pm 15h 5m 8s 🌒 (7%)Waxing Crescent: 7% illuminated at midnight, at the end of the day 11:23:34 pm 17.5° S
Thu, Nov 12 6:18:49 am 6:56:40 am +1m 50s 3:49:57 pm -1m 35s 4:27:46 pm 8h 53m 17s -3m 25s 11:23:37 am 19.47° 5:37:08 am 5:09:25 pm 4:56:49 am 5:49:41 pm 15h 8m 32s 🌒 (12%)Waxing Crescent: 12% illuminated at midnight, at the end of the day 11:23:41 pm 17.8° S
Fri, Nov 13 6:20:30 am 6:58:29 am +1m 49s 3:48:25 pm -1m 32s 4:26:22 pm 8h 49m 56s -3m 22s 11:23:45 am 19.20° 5:38:42 am 5:08:08 pm 4:58:20 am 5:48:27 pm 15h 11m 53s 🌒 (19%)Waxing Crescent: 19% illuminated at midnight, at the end of the day 11:23:50 pm 18.0° S
Sat, Nov 14 6:22:10 am 7:00:18 am +1m 49s 3:46:55 pm -1m 30s 4:25:01 pm 8h 46m 37s -3m 19s 11:23:54 am 18.94° 5:40:16 am 5:06:53 pm 4:59:50 am 5:47:16 pm 15h 15m 12s 🌒 (27%)Waxing Crescent: 27% illuminated at midnight, at the end of the day 11:23:59 pm 18.3° S
Sun, Nov 15 6:23:49 am 7:02:07 am +1m 49s 3:45:27 pm -1m 28s 4:23:42 pm 8h 43m 20s -3m 16s 11:24:04 am 18.68° 5:41:49 am 5:05:41 pm 5:01:20 am 5:46:07 pm 15h 18m 27s 🌒 (36%)Waxing Crescent: 36% illuminated at midnight, at the end of the day 11:24:10 pm 18.5° S
Mon, Nov 16 6:25:28 am 7:03:54 am +1m 47s 3:44:01 pm -1m 26s 4:22:26 pm 8h 40m 7s -3m 13s 11:24:15 am 18.43° 5:43:21 am 5:04:31 pm 5:02:48 am 5:45:01 pm 15h 21m 40s 🌒 (45%)Waxing Crescent: 45% illuminated at midnight, at the end of the day 11:24:21 pm 18.8° S
Tue, Nov 17 6:27:06 am 7:05:41 am +1m 47s 3:42:38 pm -1m 23s 4:21:12 pm 8h 36m 57s -3m 10s 11:24:27 am 18.18° 5:44:53 am 5:03:23 pm 5:04:17 am 5:43:57 pm 15h 24m 50s 🌓 (55%)
First quarter at 12:47 pm
First quarter at 12:47 pm. At midnight, at the end of the day: 55% illuminated
11:24:33 pm 19.0° S
Wed, Nov 18 6:28:43 am 7:07:28 am +1m 47s 3:41:17 pm -1m 21s 4:20:00 pm 8h 33m 49s -3m 7s 11:24:39 am 17.94° 5:46:24 am 5:02:18 pm 5:05:44 am 5:42:56 pm 15h 27m 56s 🌔 (65%)Waxing Gibbous: 65% illuminated at midnight, at the end of the day 11:24:46 pm 19.3° S
Thu, Nov 19 6:30:20 am 7:09:13 am +1m 45s 3:39:59 pm -1m 18s 4:18:51 pm 8h 30m 46s -3m 4s 11:24:52 am 17.71° 5:47:53 am 5:01:16 pm 5:07:10 am 5:41:57 pm 15h 30m 59s 🌔 (74%)Waxing Gibbous: 74% illuminated at midnight, at the end of the day 11:24:59 pm 19.5° S
Fri, Nov 20 6:31:55 am 7:10:58 am +1m 45s 3:38:43 pm -1m 16s 4:17:45 pm 8h 27m 45s -3m 0s 11:25:06 am 17.48° 5:49:22 am 5:00:16 pm 5:08:35 am 5:41:01 pm 15h 33m 58s 🌔 (83%)Waxing Gibbous: 83% illuminated at midnight, at the end of the day 11:25:14 pm 19.7° S
Sat, Nov 21 6:33:30 am 7:12:41 am +1m 43s 3:37:30 pm -1m 13s 4:16:41 pm 8h 24m 49s -2m 56s 11:25:21 am 17.26° 5:50:50 am 4:59:19 pm 5:10:00 am 5:40:07 pm 15h 36m 54s 🌔 (90%)Waxing Gibbous: 90% illuminated at midnight, at the end of the day 11:25:29 pm 20.0° S
Sun, Nov 22 6:35:03 am 7:14:24 am +1m 43s 3:36:20 pm -1m 10s 4:15:40 pm 8h 21m 56s -2m 53s 11:25:37 am 17.04° 5:52:17 am 4:58:24 pm 5:11:23 am 5:39:17 pm 15h 39m 45s 🌔 (96%)Waxing Gibbous: 96% illuminated at midnight, at the end of the day 11:25:45 pm 20.2° S
Mon, Nov 23 6:36:36 am 7:16:05 am +1m 41s 3:35:13 pm -1m 7s 4:14:41 pm 8h 19m 8s -2m 49s 11:25:53 am 16.83° 5:53:43 am 4:57:32 pm 5:12:45 am 5:38:28 pm 15h 42m 32s 🌔 (99%)Waxing Gibbous: 99% illuminated at midnight, at the end of the day 11:26:02 pm 20.4° S
Tue, Nov 24 6:38:07 am 7:17:45 am +1m 40s 3:34:08 pm -1m 5s 4:13:46 pm 8h 16m 23s -2m 45s 11:26:11 am 16.63° 5:55:08 am 4:56:43 pm 5:14:06 am 5:37:43 pm 15h 45m 16s 🌕 (99.6%)
Full moon at 3:53 pm
Full moon at 3:53 pm. At midnight, at the end of the day: 99.6% illuminated
11:26:20 pm 20.6° S
Wed, Nov 25 6:39:37 am 7:19:24 am +1m 39s 3:33:06 pm -1m 2s 4:12:53 pm 8h 13m 42s -2m 40s 11:26:29 am 16.43° 5:56:32 am 4:55:56 pm 5:15:26 am 5:37:00 pm 15h 47m 55s 🌖 (97%)Waning Gibbous: 97% illuminated at midnight, at the end of the day 11:26:38 pm 20.8° S
Thu, Nov 26 6:41:05 am 7:21:01 am +1m 37s 3:32:08 pm -58s 4:12:02 pm 8h 11m 7s -2m 36s 11:26:47 am 16.24° 5:57:54 am 4:55:12 pm 5:16:45 am 5:36:20 pm 15h 50m 29s 🌖 (92%)Waning Gibbous: 92% illuminated at midnight, at the end of the day 11:26:57 pm 21.0° S
Fri, Nov 27 6:42:33 am 7:22:37 am +1m 36s 3:31:12 pm -56s 4:11:15 pm 8h 8m 35s -2m 32s 11:27:07 am 16.06° 5:59:15 am 4:54:31 pm 5:18:03 am 5:35:42 pm 15h 52m 59s 🌖 (84%)Waning Gibbous: 84% illuminated at midnight, at the end of the day 11:27:17 pm 21.2° S
Sat, Nov 28 6:43:58 am 7:24:11 am +1m 34s 3:30:19 pm -53s 4:10:31 pm 8h 6m 8s -2m 27s 11:27:27 am 15.88° 6:00:35 am 4:53:53 pm 5:19:19 am 5:35:08 pm 15h 55m 24s 🌖 (75%)Waning Gibbous: 75% illuminated at midnight, at the end of the day 11:27:38 pm 21.3° S
Sun, Nov 29 6:45:23 am 7:25:43 am +1m 32s 3:29:29 pm -50s 4:09:49 pm 8h 3m 46s -2m 22s 11:27:48 am 15.71° 6:01:54 am 4:53:17 pm 5:20:34 am 5:34:36 pm 15h 57m 45s 🌖 (64%)Waning Gibbous: 64% illuminated at midnight, at the end of the day 11:27:59 pm 21.5° S
Mon, Nov 30 6:46:45 am 7:27:14 am +1m 31s 3:28:43 pm -46s 4:09:11 pm 8h 1m 29s -2m 17s 11:28:10 am 15.54° 6:03:10 am 4:52:45 pm 5:21:47 am 5:34:06 pm 16h 0m 0s 🌖 (53%)Waning Gibbous: 53% illuminated at midnight, at the end of the day 11:28:21 pm 21.7° S

« October 2026

December 2026 »


Got a cool idea? 💡 Found any errors? 🤦

We're always improving this website!

Year distribution of sunrise and sunset times in Raciąż, Mazovia - 2026

The following graph shows sunrise and sunset times in Raciąż, Mazovia for every day of the year. There are two jumps in the graph that represent the hour change for Daylight Saving Time (DST) in Raciąż, Mazovia.

View:
JanFebMarAprMayJunJulAugSepOctNovDecSolar noon03:0003:0006:0006:0009:0009:0012:0012:0015:0015:0018:0018:0021:0021:00Longest · Jun 21 · 16h 53mShortest · Dec 21 · 7h 36mToday · Solar noonToday · 8h 19mEarliest sunrise 4:14 am · Jun 17Earliest sunrise4:14 am · Jun 17Latest sunrise 7:51 am · Dec 30Latest sunrise7:51 am · Dec 30Earliest sunset 3:23 pm · Dec 13Earliest sunset3:23 pm · Dec 13Latest sunset 9:08 pm · Jun 24Latest sunset9:08 pm · Jun 24

Daylight   Dawn & dusk (civil twilight)   Night   Solar noon  ·  Vertical steps in the curves = DST clock change

Earliest and latest sunrise and sunset in Raciąż, Mazovia

In Raciąż, Mazovia, the earliest sunrise of 2026 is on June 17 at 4:14 am, while the latest sunrise is on December 30 at 7:51 am. The earliest sunset is on December 13 at 3:23 pm, and the latest sunset is on June 24 at 9:08 pm.

Raciąż, Mazovia gets 9h 17m more daylight on the longest day than on the shortest one (16h 53m versus 7h 36m). Averaged over the whole year, a day lasts 12h 17m.

Raciąż Analemma

Due to Earth's tilted axis and slightly elliptical orbit, the Sun is never seen in the same position at noon in Raciąż. Throughout the year, it slowly traces this figure-eight:

June solstice · Jun 21 · Sun altitude: 60.4°December solstice · Dec 21 · Sun altitude: 13.6°March equinox · Mar 20 · Sun altitude: 37.1°September equinox · Sep 22 · Sun altitude: 37.1°Today · Nov 23 · Sun altitude: 16.5°
June solstice December solstice Equinoxes Today
Raciąż analemma interactive visualizer.
Move along the curve to read the Sun's altitude and azimuth for any day of the year in Raciąż.

Over the year, the 12:00 Sun swings between just 13.6° above the horizon (around Dec 20) and 60.4° (around Jun 23) in Raciąż. The smaller loop sits at the top, the signature of a Northern Hemisphere analemma. Notice the whole figure leans west of the meridian: over Raciąż the Sun reaches its highest point between 11:23 and 11:53 depending on the time of year, but always before 12:00.

Detailed Analemma Chart

See a technical version of this analemma, with exact dates and Sun altitudes, and download it in high resolution.

The technical chart below plots one dot per day, labels the first day of each month, marks the solstices, equinoxes, perihelion and aphelion, and draws the noon altitude of the equinoxes (90° minus your latitude) together with its ±23.4° seasonal limits.

Raciąż analemma chart: the Sun at 12:00 (standard time) through the year

Download Raciąż Analemma Chart (SVG)

Why does the figure look wider here than in the sky view above?

Both draw the same data, but with different conventions. The sky view uses the same scale on both axes, so it shows the analemma with its true proportions, as a camera would capture it: about 47° tall and only a few degrees wide. This chart, like most technical analemma diagrams, stretches each axis independently to fill the plot, expanding the narrow azimuth range several times so its day-to-day variation can actually be read. Also, azimuth is not sky distance: near the zenith, one degree of azimuth spans much less than one degree across the sky, which further widens the figure in this representation.

Places near Raciąż, Mazovia

These nearby towns and cities have almost the same sunrise and sunset times as Raciąż, Mazovia — the difference is only seconds to a couple of minutes. Select any place to see its own sun calendar:

Drobin 10 kmGlinojeck 12 kmSiemiątkowo 13 kmBaboszewo 15 kmStrzegowo 17 kmZawidz 17 kmRadzanów 18 kmDzierzążnia 19 km

Larger cities around Raciąż, and how much earlier or later the sun sets there today:

Płock 3 min laterWłocławek 5 min laterKutno 5 min laterWarsaw 1 min earlierSkierniewice 3 min later